LOGISTICS WAREHOUSE

Castel San Giovanni (PC) Z1

A building fitted with an NFPA-regulation fire-prevention sprinkler system, LED lighting, BMS, heat-pump air conditioning, a circa 300-Kwp photovoltaic system and charging points for electric vehicles.


Planning was carried out with BIM technology, and the building has been constructed with a focus on sustainability principles, obtaining BREEAM certification at the EXCELLENT level.

WORKS COMMENCED: 26 OCTOBER 2020

WORKS COMPLETED: 15 MAY 2021

CERTIFICATION: BREEAM EXCELLENT

SPECIFICS: 300 KWP PHOTOVOLTAIC SYSTEM

M2 TOTAL SURFACE AREA