Follow Us
Document Download
CROSS DOCKING

Bologna Pallex

A building fitted with an NFPA and FM-regulation sprinkler system, LED lighting, BMS to manage facilities, heat-pump air conditioning, a 255-Kwp photovoltaic system and 4 charging points for electric vehicles.


Numerous innovative methods were employed in the construction of this building, leading to significant benefits both in terms of comfort and sustainability, such as, for example, the construction of a green roof to cover the offices, comprising of a roof garden with cascading evergreen shrubs. On the deposit side of the building, LED-backlit translucent panels have been installed to provide increased external and internal lighting. Planning was carried out with BIM technology, and the building has been constructed with a focus on sustainability principles, obtaining BREEAM certification at the EXCELLENT level.

WORKS COMMENCED: 1 FEBRUARY 2021

WORKS COMPLETED: 30 JUNE 2021

TOTAL SURFACE AREA: 13.450 m2

LOADING BAYS
0
 
BOLOGNA PALLEX

Gallery