LOGISTICS WAREHOUSE

Piacenza DC6

A building fitted with an NFPA-regulation sprinkler system, LED lighting, heat-pump air conditioning system, 4 charging points for electric vehicles and an 18-KWp photovoltaic system on the roof, all guaranteeing high performance in terms of comfort and energy savings.


The use of materials with a high reflectance index (SRI) reduces the heat-island effect. The building has been constructed with a focus on sustainability principles, obtaining LEED SILVER certification.

WORKS COMMENCED: 15 JUNE 2021

WORKS COMPLETED: 28 FEBRUARY 2022

TOTAL SURFACE AREA: 43.310 m2